Transformer Loss Measuring System
Product Overview
The VERXON Transformer Loss Measurement (TLM) System is designed for no-load loss, no-load current and load loss testing of power transformers. It integrates high-accuracy measurement, automatic control, data acquisition and report generation to provide an efficient and reliable transformer loss testing solution.
The system uses computer and PLC control to coordinate the testing process, reduce repetitive manual operations and improve testing efficiency and consistency.
Applications
• Power transformer no-load loss testing
• Power transformer no-load current testing
• Power transformer load loss testing
• Transformer factory and routine testing
• Transformer quality inspection and performance verification
Key Functions
• High-accuracy voltage, current and power measurement
• Automatic computer and PLC control
• Automatic test data acquisition and storage
• Automatic test report generation
• Export of test results in Excel, PDF and Word formats
• Overcurrent and overvoltage protection
System Features
• Stable and coordinated testing process
• Simplified operation and reduced manual work
• Efficient test data management
• Convenient report generation and export
• Configuration according to transformer ratings and project requirements
Frequently Asked Questions
What is a Transformer Loss Measurement System?
A Transformer Loss Measurement System is used to measure the no-load loss, no-load current and load loss of power transformers.
What quantities can the TLM system measure?
The system measures the voltage, current and power required for transformer no-load and load loss testing.
How is the testing process controlled?
The testing process is coordinated through computer and PLC control, supporting automatic measurement, data acquisition, storage and report generation.
Which report formats are supported?
Test results can be exported in Excel, PDF and Word formats.
Can the TLM system be customized?
Yes. The measurement functions, system configuration and scope of supply can be determined according to the transformer ratings and agreed project requirements.





